|
MÁV - Vecsés railway one putting over |
|
|
 Our firm railway container one putting over are at REWOX disposal on more of the country's dots, on which more important railway stations can be found. |
 AREWOX the task of railway one putting over the road one and the railway hazardous waste the creation of a contact between transport. |
 From the petrol stations being qualified as the hazardous waste collected oily mud with a container car we transport it to the one putting over. |
 The cargo of the container car gets into a steel container, which is with a lockable safe implementation, on the one putting over. |
 We transport the containers on a railroad onto the final disposal depot where it is cleared, we transport it back into the suitable railway one putting over then. |
|