 Szeged OMV soil opened up on the area of a filling station and groundwater pollution a row got to recompensing him following the exploration. |
 Our firm started the damage elimination works on the area of the petrol station after the acceptance of the plans. |
 The hydrocarbon polluted soil getting some air we recompensed it on a manner, to which we installed different equipments,. |
 The elements of the soil air the reinforced concrete we settled it into the mine, which we placed on the area of the filling station,. |
 Soil opened up on Szeged, on Kálvária square and groundwater pollution as the first step of his damage elimination works in the soil placed one system. |
 The task of the piping the contaminated soil getting some air. |
 It invested in a ditch the air flows into the soil from perforated pipes, then that cross, freeing soiling from the soil into the free one. |
 The plastic defender pipe the electric harness plays the role of a leader's, insulator's channel. |
 We fenced in the work area for the prevention of the accidents according to the labour protection regulations here his aim. |
 The wasted underground water we gain it from producer wells. |
 The water comes from these producer wells into the clearing equipment. The drill shirt of one of the producer wells happens on the picture. |
 We locked the producer wells with a sealing cap, one with switch operating swimming into them sinking installed, which ones the automatic exploitation of the water is insured. |
 The beginning of the setup of the underground water cleaner. On the picture one of the reinforced concretes REWOX SR the buf |
 The mine plays the role of a buffer in the system, they store the water in his contaminated, state cleaned concerned temporarily with more of his companions.
|
 The setup important the suitable accurate setting of the levels, we use a calibrated leveller instrument because of this. |
 The mines bumming around between the field works owes. The inner engineering elements get to their place already in the course of the prefabrication. |
 The art object in the forefront single REWOX MOS type oildetaching equipment. This art object receives the contaminated water posted by way of the pumps. |
 The part of the equipment one REWOX SR sztrippelőtorony settled on a buffer container, which was made of reinforced concrete likewise in this case. |
 We supplied it with an aesthetic exterior coating following the equipment, the setup. |
 Planted REWOX STRIP stripe equipment the underground water dry cleaners Szeged OMV operates as the subunit of the system on the filling station.
|
 The underground water dry cleaners cleaned water in the drain field worked up on the area of the filling station in a system dry. |  The hydrocarbon stepping out from the soil air system polluted air with derivatives providing we let it through a filter system into the free one. |