Szeged OMV soil opened up on the area of a filling station and groundwater pollution a row got to recompensing him following the exploration.

Our firm started the damage elimination works on the area of the petrol station after the acceptance of the plans.

The hydrocarbon polluted soil getting some air we recompensed it on a manner, to which we installed different equipments,.

The elements of the soil air the reinforced concrete we settled it into the mine, which we placed on the area of the filling station,.

Soil opened up on Szeged, on Kálvária square and groundwater pollution as the first step of his damage elimination works in the soil placed one system.

The task of the piping the contaminated soil getting some air.

It invested in a ditch the air flows into the soil from perforated pipes, then that cross, freeing soiling from the soil into the free one.

The plastic defender pipe the electric harness plays the role of a leader's, insulator's channel.

We fenced in the work area for the prevention of the accidents according to the labour protection regulations here his aim.

The wasted underground water we gain it from producer wells.

The water comes from these producer wells into the clearing equipment. The drill shirt of one of the producer wells happens on the picture.

We locked the producer wells with a sealing cap, one with switch operating swimming into them sinking installed, which ones the automatic exploitation of the water is insured.

The beginning of the setup of the underground water cleaner. On the picture one of the reinforced concretes REWOX SR the buf

The mine plays the role of a buffer in the system, they store the water in his contaminated, state cleaned concerned temporarily with more of his companions.

The setup important the suitable accurate setting of the levels, we use a calibrated leveller instrument because of this.

The mines bumming around between the field works owes. The inner engineering elements get to their place already in the course of the prefabrication.

The art object in the forefront single REWOX MOS type oildetaching equipment. This art object receives the contaminated water posted by way of the pumps.

The part of the equipment one REWOX SR sztrippelőtorony settled on a buffer container, which was made of reinforced concrete likewise in this case.

We supplied it with an aesthetic exterior coating following the equipment, the setup.

Planted REWOX STRIP stripe equipment the underground water dry cleaners Szeged OMV operates as the subunit of the system on the filling station.

The underground water dry cleaners cleaned water in the drain field worked up on the area of the filling station in a system dry.

The hydrocarbon stepping out from the soil air system polluted air with derivatives providing we let it through a filter system into the free one.